Thus, calculated with an average amount of investment per connection based on experiences in Winterswijk (detail engineering). The number of actually closing addresses and the number of participants at this stage based on the most reliable assumptions. That includes estimates of operating costs, inflation and interest rates. Also in view of the relatively limited empirical data and the long duration of the operation lies in the estimates, by definition, a certain degree of uncertainty.
번역되고, 잠시 기다려주십시오..